Measure the electrical energy used within a defined blowing-system boundary and divide it by the number of accepted bottles produced over the same period. Multiply the result by 1,000 to report kilowatt-hours per 1,000 accepted bottles. Include the relevant compressor, cooling, and auxiliary loads, and state how startup, idle time, rejects, and shared utilities are treated.
Why Use Accepted Bottles Instead of Machine Output?
A blower can discharge bottles that fail inspection or cannot be used downstream. Those bottles have consumed energy even though they do not contribute to saleable production. Dividing by every bottle discharged can make an unstable process appear more efficient than it is.
Define the acceptance point before measuring. It may be the released bottle count at the blower discharge or another agreed quality gate. If the count is taken after filling, explain how losses unrelated to blowing are treated so the metric remains interpretable.
Use the same acceptance definition in every comparison. A result based on uninspected machine counts cannot be fairly compared with one based on released bottles. Keep reject quantities and reasons alongside the energy record so a changing denominator can be understood.

What Is the Calculation?
Specific energy in kWh per 1,000 accepted bottles equals measured energy in kWh divided by accepted bottle quantity, multiplied by 1,000. Energy and production must cover the same start and finish times. Record opening and closing meter readings rather than relying on an instantaneous power display.
For example, suppose the included equipment uses 620 kWh while producing 100,000 accepted bottles. The result is 6.2 kWh per 1,000 accepted bottles. The energy and bottle quantities in this example are invented inputs chosen to show the arithmetic; obtain measured values from the installation being evaluated.
If the same energy were divided by 105,000 total discharged bottles, the reported figure would be about 5.90 kWh per 1,000. That lower number reflects a different counting basis. It does not demonstrate that the installation used less electricity.
Which Equipment Belongs Inside the Boundary?
At minimum, state whether the measurement covers only the blower or the complete equipment needed to produce the bottles. The wider boundary may include preform feeding, heating, drives, high-pressure air, air treatment, cooling pumps, chillers, and dedicated bottle transfer. Clearly identify any excluded equipment.
Check the electrical distribution before adding meter readings. Some auxiliaries may already be supplied through the blower’s measured feeder. Counting their separate readings again would inflate the total.
| Energy Item | Measurement Question |
| Blower and Oven | Does the feeder include all heating, drives, and controls? |
| Compressed Air | Is compressor energy dedicated or allocated from a shared system? |
| Air Treatment | Are dryer and other treatment loads included? |
| Cooling | Which pumps and chillers serve the measured production? |
| Handling Equipment | Are preform feed and bottle transfer inside the boundary? |
Keep a simple diagram or equipment list with the report. The boundary should be understandable to someone who did not perform the measurement. A supplier comparison is useful only when both proposals use compatible boundaries and operating conditions.

How Should Shared Compressed Air Be Allocated?
Direct measurement of a dedicated compressor package is often easier to interpret than an estimate from a shared plant system. Where air is shared, measure the relevant consumption and establish an allocation method that accounts for pressure level and compressor behavior. A simple percentage of installed motor power is rarely a strong representation of actual use.
Record the compressor’s electrical energy and the agreed air-flow basis over matching periods. Label every air measurement with its reporting basis, including the temperature and pressure used to express a normalized volume, before combining it with an energy-per-volume factor. Do not multiply incompatible flow units and specific-energy figures.
Include loading, unloading, standby, leaks, and control behavior in the assessment where they fall inside the chosen boundary. A compressor may consume power while the blower is stopped. Removing that time from one calculation but retaining it in another can reverse the apparent comparison.
For multiple pressure levels or complex shared systems, use a qualified energy assessment to establish a defensible allocation. State the uncertainty if an estimate must be used. Keep measured values separate from assumptions in the final worksheet.
Should Startup and Idle Energy Be Included?
Report a steady-production test and a representative shift or campaign result separately when both are useful. The steady test helps compare a stable operating point. The shift result captures the effect of warm-up, stops, waiting, and changeovers on the factory’s actual electricity use.
Define the beginning and end of the campaign before collecting data. For example, specify whether oven warm-up begins the measurement and whether shutdown auxiliaries remain included. Avoid choosing a favorable interval after seeing the readings.
Record operating states with timestamps: warm-up, producing, starved, blocked, changeover, fault, and shutdown as relevant. This makes the result actionable. A high specific-energy figure caused by long waiting periods requires a different response from excessive energy during stable production.
Which Production Conditions Must Be Recorded?
Identify the bottle design, preform weight and specification, neck finish, resin information, and accepted quality criteria. Record the active cavities, production rate, recipe, blowing pressure, cooling conditions, and ambient conditions. Changes in those inputs can affect both energy demand and the accepted count.
Compare like-for-like production before claiming an improvement. A smaller bottle at higher output is not automatically evidence that the same bottle became more efficient. Where the product mix changes, report format-specific figures or explain the weighting method used for the combined result.
Keep the production count synchronized with the energy meters. Check how counters handle resets, rejected bottles, test samples, and interrupted runs. A small count error can become significant when the measurement period is short.
What Instruments and Measurement Period Are Needed?
Use suitable electrical energy meters installed by qualified personnel and appropriate to the supply and load. Verify meter configuration, current-transformer ratios where applicable, and the units shown. Do not infer kWh from a motor nameplate rating multiplied by elapsed time unless the result is clearly labeled as a rough estimate.
Choose a duration that captures stable operation and the relevant cycling of compressors and chillers. Very short tests may be dominated by equipment starting or stopping. Repeat the test when necessary to understand variability rather than treating one brief reading as a permanent rating.
Record calibration or verification status and the expected uncertainty of important measurements. For practical improvement work, consistent methods may be as important as extra decimal places. Avoid reporting precision that the meters and production count cannot support.
How Can the Result Guide Improvements?
Separate the major energy users before choosing an action. Heating, compressed air, cooling, and idle operation may offer different opportunities. Review leaks, pressure settings, maintenance, scheduling, and approved energy-saving options with the equipment suppliers.
Do not reduce pressure, heat, or cooling simply to improve the energy number while accepting weaker bottles. Verify package quality and accepted output after each change. An apparent saving can disappear when additional rejects or slower production are included.
When comparing a PET bottle blowing machine, request a test using your package and an agreed measurement boundary. Ask for both the energy result and the conditions that produced it. A percentage-saving claim without a defined baseline is difficult to apply to your factory.
How Should Energy Be Converted Into Cost?
Multiply the measured kWh per 1,000 accepted bottles by the applicable energy price for a simple electricity-cost estimate. Where tariffs include demand charges or time-dependent rates, model those separately. The energy metric and the electricity bill answer related but different questions.
Use the measured result in the bottling line return-on-investment model with realistic production hours and product mix. Retain the original readings and assumptions so the calculation can be updated. The most useful benchmark is one the plant can reproduce and explain.